More HVAC details
Jul. 3rd, 2025 11:59 pm![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
Today I met an engineer who does all the specs and bidding for heat pump installations and replacement, and we looked at my house and its existing system and discussed what needs to be done. Unfortunately, the space for the indoor part of my current system was designed too narrowly; they now make the equipment wider. Also, after 30+ years of cats, etc., in the house, it’s high time to get the ducts cleaned. I’ll have to do tons of work to get ready for that, especially as there are some ducts that aren’t particularly accessible now, like the one under my bed and a possible one beneath the livingroom bookcases.
After that, J and I did some errands together then sat outside eating a wedding anniversary dinner. Unfortunately, Azalyn ate the wax paper that had been under my lasagna – I hope her little digestive system can cope with it.
After that, J and I did some errands together then sat outside eating a wedding anniversary dinner. Unfortunately, Azalyn ate the wax paper that had been under my lasagna – I hope her little digestive system can cope with it.
no subject
Date: 2025-07-04 03:23 pm (UTC)no subject
Date: 2025-07-04 07:48 pm (UTC)no subject
Date: 2025-07-05 08:52 pm (UTC)no subject
Date: 2025-07-06 07:47 pm (UTC)no subject
Date: 2025-07-07 01:58 pm (UTC)no subject
Date: 2025-07-07 07:03 pm (UTC)no subject
Date: 2025-07-05 08:50 pm (UTC)no subject
Date: 2025-07-06 07:46 pm (UTC)no subject
Date: 2025-07-08 12:21 am (UTC)no subject
Date: 2025-07-08 08:09 am (UTC)